Skip to main navigation.

Peak Alert: 1/31/2019

Due to high forecasted loads this evening, we will be experiencing a Peak Alert period. 

Commercial and Industrial loads will be controlled by 4:50 PM and restored by 8:00 PM.  This includes loads on strategies 5A, 5B and rate AE-1. Grain Drying will be off at 4:50 PM and restored by 8:50 PM. Alert Devices on address 511 will light the Peak Alert lamp and sound audible alarm at 3:50 PM, and the Full Load Control lamp will light at about 4:50 PM. 

Residential loads will be controlled from approximately 5:00 PM and restored by 11:00 PM.

Powered by Touchstone Energy Cooperatives Logo